Greeters Lobby Terminal E & F at MIA
This portion of the Miami International Airport was originally built in 1947 as a section of the original building. Untouched […]
This portion of the Miami International Airport was originally built in 1947 as a section of the original building. Untouched […]
“The Greater Orlando Aviation Authority (GOAA) selected our firm to provide architectural and engineering services for the Main Ticket Lobby
“Our team, under an independent contract with the airport operator, developed the design and produced construction documents for the new
“Aeropuertos de Oriente, the Regional Airports Concessionaire, upgrade in six existing airports located in the Northeast region of Colombia through
The relocated BCAD offices’ new work environment was planned to optimize daylight and views to all occupants; to create an
The project consisted of creating a comprehensive Design Criteria Package for a hangar addition, site work, and minor renovations for
Our team, in a joint venture, is leading the $450 million expansion and modernization of Fort Lauderdale-Hollywood International Airport, designed
We provided Miami International Airport full-time on-site management to oversee the design and installation of the Gate Delivery Baggage System
Our team provided terminal planning services to assist the Airport Authority of Trinidad and Tobago (AATT) and stakeholders in evaluating
The team is providing commercial real estate and land development master planning services in connection with the development and improvement