Boone High School
“We developed the comprehensive master plan to revitalize and re-energize Orlando’s historic Boone High School, originally built in 1952. The […]
“We developed the comprehensive master plan to revitalize and re-energize Orlando’s historic Boone High School, originally built in 1952. The […]
Initially, the North Miami Senior High replacement project was set to utilize the original site of 16.5 acres. The existing
“Our team was commissioned to revitalize the prestigious and historic Naples High School through the implementation of a new campus
The once beautiful and elaborate school was slated for major renovation and modernization, a project for which M-DCPS committed significant
The existing facility included a total of 18 permanent buildings, built between 1958-2006, with associated covered walkways. The site also
“The Miami Beach Senior High School phased replacement project is situated on a small but prominent urban site with limited